2

days of planning

5000

total budget

8

days total project duration

01. Bath tub removal

To carry out this project the first step was to remove the old bathtub.

02. Tile application

Once the bathtub was removed, from the design of the project, the application of tile on the floor and walls of the shower space was carried out.

03. Sink cabinet replacement

Lastly, the bathroom cabinet was replaced with a more modern piece suitable for the new look of the bathroom.

See the before and after!