2
days of planning
5000
total budget
8
days total project duration
To carry out this project the first step was to remove the old bathtub.
02. Tile application
Once the bathtub was removed, from the design of the project, the application of tile on the floor and walls of the shower space was carried out.
03. Sink cabinet replacement
Lastly, the bathroom cabinet was replaced with a more modern piece suitable for the new look of the bathroom.